This project required the design and installation of a door entry system to a multiple occupancy apartment block in the Midlands. It was essential to install in a timely manner and to minimise disruption to residents.
Project Requirements
- Install power supply to suit
- Install 500kg Maglock to door to allow for PVC door
- Install handsets for each apartment in agreed locations
- Main external rated call point to front of building with integral key pad for access
- Install main system processor
- Commission and perform full testing
Project Outcome
We completed the full project on time and to budget. The apartments now have secure entry and enhanced security.